Manuali I Cmimeve Te Ndertimit 2024 〈2024〉
Ardi had been a site engineer for twelve years. He’d survived the price chaos of 2022 when a bag of cement jumped 40% overnight. He’d seen subcontractors walk off sites in 2023 when diesel hit 300 lekë per liter. But this—this thin manual—was different. This was the government’s final word on how much a brick, a beam, or a bucket of paint was allowed to cost in public works.
He opened his own copy of the manual. Page 47: Çimento (CEM II 42.5R) – 9,800 lekë/ton. Page 112: Gips karton (12.5 mm) – 720 lekë/m². Page 203: Dorëpunimi për muraturë tullash – 1,450 lekë/m² (përfshirë ngjitësin). manuali i cmimeve te ndertimit 2024
It was the Manuali i Çmimeve të Ndertimit 2024 . Ardi had been a site engineer for twelve years
Then Ardi remembered something. On page 289, buried in the annexes: “Për materialet e importuara me çmim doganor mbi referencën manuale, kontraktori mund të aplikojë me faktura.” For imported materials with customs value above the manual’s reference, the contractor could apply with invoices. But this—this thin manual—was different
He pulled out his pen. On the bid form, he wrote his total: 48,720,000 lekë. Exactly 5.8% above the manual’s baseline, but justified by four attached invoices and a notarized exchange rate statement from the Bank of Albania.
His heart sank. The labor rate was 200 lekë lower than what he actually paid his master masons. But the manual had a footnote: “Për projekte me afat mbi 12 muaj, indeksimi automatik lejohet.” For projects longer than 12 months, automatic indexing was allowed.